Damian Miller |
Ongoing 2021 |
$374,000 |
3 Months |
PROJECT NAME : Chifley Hotel Refurbishment
LOCATION : 226 South Tce, Adelaide SA
A combination of demolition, asbestos removal and lead dust extraction.
This project consisted of the complete internal defit of existing hotel and motel; all door, walls, ceilings and internal fittings were removed, leaving a bare shell for the refurbishment.
External demolition was also completed, demolishing external structures, canopies, existing pool and spa, kerbing and landscape.
Various asbestos material was removed throughout, as well as lead dust which was discovered during the demolition. A secure plastic bubble enclosure was erected to complete the removal of significant lead and friable asbestos which included the use of negative air units and decontamination showers.
https://dvservices.com.au/projects/item/30-chifley-hotel-refurbishment.html#sigProIdafca284c08